Two Component Polyurea Coating ST-TC (Series)

Two-component polyurea coating is composed of components A and B.
Two-component polyurea coating has high strength, good toughness, strong adhesion and rapid curing. It is waterproof and anticorrosive, has excellent weather resistance, and is environmentally friendly and safe.
Efficient construction with short construction period and low cost. It has wide application, suitable for multiple fields and various substrates. It provides long-term protection. The quality is reliable with after-sales service.

    Product Introduction

    Two Component Polyurea Coating ST-TC (Series) (2)38a
    ST-TC100 manual polyurea is a two-component, brushable or rollable aromatic polyurea elastic material. It has a moderate construction period, good leveling property, and a flat and smooth appearance. This product has excellent physical properties, such as high strength, good toughness, and fast construction. When it needs to be used outdoors, it can be used with a matching topcoat to avoid yellowing of the color.

    Uses

    Waterproofing for building roofs, basements, bathrooms, swimming pools, sewage ponds, and various civil and industrial buildings.

    Performance indicators

    Type

    ST-TC100

    Tensile strength(MPa) ≥10
    Elongation at break(%) ≥300
    Leveling property 20min No obvious creases
    Tear strength,MPa ≥40
    Low temperature bending property /℃ ≤-35℃
    Impermeability 0.3MPa,120min,Impermeability
    Adhesive strength,MPa ≥2.0
    Corrosion resistance(2%H2SO4 solution,168h) No bubbles, no detachment, no cracks

    Construction process suggestions

    Clean the base layer: The base layer acceptance should achieve a flat surface, no sanding, no peeling, no honeycomb pitting, and no uneven bumps and other defects. The surface of the base layer should be kept dry, and there must be no visible water.
    Primer layer: It is advisable to use spraying, brushing or rolling to evenly apply the special sealing primer on the surface of the base layer (the primer layer is prohibited from being constructed if the base material surface is not completely treated). The next step can be constructed only after it is completely dry. The construction interval should not exceed 24 hours.
    Polyurea layer: Manual construction or ordinary cold spraying is adopted. Generally, spraying is carried out 2 hours after the primer construction is completed and before 24 hours. The ratio of components A and B is 1:2. The construction thickness is about 2 to 3mm to ensure no missed coating, no accumulation, uniform spraying, and one-time molding in place.
    (The thickness can be adjusted according to the design requirements).
    Topcoat layer: Manual brushing or spraying is used for construction. The construction thickness is 0.2 to 0.5mm, and it is sprayed or brushed evenly.

    Product Introduction

    Two Component Polyurea Coating ST-TC (Series) (3)ukp
    ST-TC200 manual polyurea is a two-component, brushable or rollable aromatic polyurea elastic material. It has excellent physical properties, with higher strength and better toughness, and can reach the strength of sprayed polyurea. When it needs to be used outdoors, it can be used with a matching topcoat to avoid yellowing of the color.

    Uses

    Industrial building places such as various chemical liquid storage tanks, oil/gas transportation tanks, power plant liquid storage ponds, salt factory liquid ponds, landfill waterproofing and anti-seepage, and hydropower station dam waterproofing and anti-seepage.

    Performance indicators

    Type

    ST-TC200

    Tensile strength(MPa) ≥16
    Elongation at break(%) ≥450
    Leveling property 20min No obvious creases
    Tear strength,MPa ≥50
    Low temperature bending property /℃ ≤-40℃
    Impermeability 0.3MPa,120min,Impermeability
    Adhesive strength,MPa ≥2.5
    Corrosion resistance(2%H2SO4 solution,168h) No bubbles, no detachment, no cracks

    Construction process suggestions

    Clean the base layer: The base layer acceptance should achieve a flat surface, no sanding, no peeling, no honeycomb pitting, and no uneven bumps and other defects. The surface of the base layer should be kept dry, and there must be no visible water.
    Primer layer: It is advisable to use spraying, brushing or rolling to evenly apply the special sealing primer on the surface of the base layer (the primer layer is prohibited from being constructed if the base material surface is not completely treated). The next step can be constructed only after it is completely dry. The construction interval should not exceed 24 hours.
    Polyurea layer: Manual construction or ordinary cold spraying is adopted. Generally, spraying is carried out 2 hours after the primer construction is completed and before 24 hours. The ratio of components A and B is 1:2. The construction thickness is about 2 to 3mm to ensure no missed coating, no accumulation, uniform spraying, and one-time molding in place.
    (The thickness can be adjusted according to the design requirements).
    Topcoat layer: Manual brushing or spraying is used for construction. The construction thickness is 0.2 to 0.5mm, and it is sprayed or brushed evenly.

    Product Introduction

    Two Component Polyurea Coating ST-TC (Series) (4)7n7
    ST-TC400 manual polyurea is a two-component, brushable or rollable aliphatic polyurea elastic material. This product has super weather resistance, excellent physical properties, high strength, good toughness, and fast construction. After being exposed to ultraviolet rays for 10 years, the performance retention rate of ST-TC400 applied in outdoor flooring projects is still above 90%.

    Uses

    Used in various high-level sports venues such as tennis courts, basketball courts, badminton courts, tracks, and sports stands; high-end commercial community flooring; water parks; topcoats, anti-corrosion on the surface of automobile metal parts, and so on.

    Performance indicators

    Type

    ST-TC400

    Tensile strength(MPa) ≥10
    Elongation at break(%) ≥300
    Leveling property 20min No obvious creases
    Tear strength,MPa ≥50
    Low temperature bending property /℃ ≤-40℃
    Impermeability 0.3MPa,120min,Impermeability
    Adhesive strength,MPa ≥2.5
    Corrosion resistance(2%H2SO4 solution,168h) No bubbles, no detachment, no cracks

    Construction process suggestions

    Clean the base layer: The base layer acceptance should achieve a flat surface, no sanding, no peeling, no honeycomb pitting, and no uneven bumps and other defects. The surface of the base layer should be kept dry, and there must be no visible water.
    Primer layer: It is advisable to use spraying, brushing or rolling to evenly apply the special sealing primer on the surface of the base layer (the primer layer is prohibited from being constructed if the base material surface is not completely treated). The next step can be constructed only after it is completely dry. The construction interval should not exceed 24 hours.
    Polyurea layer: Manual construction or ordinary cold spraying is adopted. Generally, spraying is carried out 2 hours after the primer construction is completed and before 24 hours. The ratio of components A and B is 1:2. The construction thickness is about 2 to 3mm to ensure no missed coating, no accumulation, uniform spraying, and one-time molding in place.
    (The thickness can be adjusted according to the design requirements).
    Topcoat layer: Manual brushing or spraying is used for construction. The construction thickness is 0.2 to 0.5mm, and it is sprayed or brushed evenly.
    Note: The entire scraping process must be repeatedly scraped with force using the cross method to avoid defects.